  • April 28, 2022

    Jan De Nul won cable contract for 500 MW interconnector project between Ireland and UK

    Jan De Nul Group has signed a contract with Sumitomo Electric Industries, Ltd. (Sumitomo Electric) for the installation of two subsea HVDC cables and one fibre optic cable that will link the existing...

    Read more
  • December 20, 2021

    Jan De Nul wins turbine installation contract for 350 MW wind farms in Denmark

    Jan De Nul Group has been awarded the transport and installation of a total of 41 wind turbines of 8.4 MW each for the offshore wind farm Vesterhav Nord & Syd in Denmark.

    Read more
  • July 16, 2021

    Jan De Nul signs deal for Dogger Bank C turbine construction

    Dogger Bank Wind Farm and Jan De Nul Group have signed the final contract for the transport and installation of 87 GE Haliade-X 14 MW offshore wind turbines. Dogger Bank C at up to 200 km off the York...

    Read more
  • July 06, 2021

    Jan De Nul completes installation of all wind turbines in TPC offshore wind farm project

    Jan De Nul Group has completed the installation of all 21 offshore wind turbines for the 109.2 MW Taiwan Power Company Offshore Windfarm Phase 1 Project – Demonstration, including the installati...

    Read more
  • August 11, 2020

    Jan De Nul signs final contract for turbine transport and installation at Dogger Bank offshore wind project off Yorkshire

    Dogger Bank Wind Farm and Jan De Nul Group have signed the final contract for the transport and installation of the GE Haliade-X offshore wind turbines at Dogger Bank A and Dogger Bank B, 130 km off t...

    Read more
  • June 23, 2020

    Jan De Nul Group completes construction of 200 MW wind farm in Trianel Borkum II in Borkum

    Jan De Nul Group has completed the offshore Trianel Windpark Borkum II (TWBII) project in the German North Sea. All 32 Wind Turbine Generators (WTG) have been installed and mechanically completed. Ja...

    Read more
  • April 16, 2020

    All turbines installed for 219 MW offshore wind farm in Belgium

    All 23 turbines have been fully installed at the 219 MW Northwester 2 project in Belgium. In a joint operation with MHI Vestas and Jan De Nul Group, Parkwind completed the final installation of turbin...

    Read more
  • April 13, 2020

    JDR completes cable load-out for Changhua Offshore Wind Project

    JDR Cable Systems (JDR), the leading supplier of subsea umbilicals and power cables to the offshore energy industry, owned by the TFKable Group, has completed the delivery of subsea power cables and a...

    Read more
  • October 23, 2019

    SSE contracted Jan De Nul for the Dogger Bank project development

    SSE Renewables has selected Jan De Nul Group to build the 3.6 GW Dogger Bank offshore wind power complex in the North Sea. Jan De Nul Group’s new offshore jack-up installation vessel...

    Read more
  • October 18, 2019

    Final wind turbine installed at Formosa 1 in Taiwan

    Formosa 1 has announced the complete installation of all 20 wind turbines for phase 2 of the project. Formosa 1 is the first commercial-scale offshore wind farm in Taiwan and will be able to...