Qair Brasil completed the construction of foundations for 29 wind turbines that will be part of the 223 MW Serra do Mato wind and solar power hybrid complex located in the State of Ceara in Brazil.
The wind farm portion of the renewable energy complex will have 121.8 MW installed capacity.